3/8"-16 UNC Grade 5 Torque & Tap Drill Spec
SAE J429 / ASTM A449Live Joint Clamp & Torque Engine
K = 0.20
75% Sp
Lubrication Condition Presets:
Recommended Tightening Torque T = K·d·Fi
41.864 N·m
30.877 ft-lbs | 370.52 in-lbs | 4.2689 kgf·m
Calibrated for Dry / Bare Steel conditions.
Clamp Preload Fi
21.976 kN
4,940.3 lbf
Target tension across joint interface
75% Tap Drill d - P
7.938 mm
5/16" (0.3125 in) (92.4% Eng.)
50% Hard Metal Drill: 8.666 mm
Direct Engineering Specification Summary
The recommended tightening torque for a 3/8"-16 UNC Grade 5 bolt is 41.864 N·m (30.877 ft-lbs) when dry (K=0.20) and 31.398 N·m (23.158 ft-lbs) when lubricated (K=0.15), generating a clamp preload of 21.976 kN (4,940.3 lbf) at 75% proof load. Standard 75% tap drill is 5/16" (0.3125 in).
Thread & Hole Blueprint Visualizer
ASME B1.1 Unified Inch Screw Threads (60° UN) Stress Area (As) 49.993 mm²
Pitch Diameter (d2) 8.494 mm
Minor Diameter (d1) 7.806 mm
Step-by-Step Mathematical Derivation
VDI 2230 / ISO 898-1Step 1: Tensile Stress Area (As)
As = (π / 4) × (d − 0.9382 × P)²
As = (π / 4) × (9.525 − 0.9382 × 1.5875)² = 49.993 mm²
Step 2: Proof Load (Fp)
Fp = As × Sp
Fp = 49.993 mm² × 586.1 N/mm² = 29301 N (29.301 kN)
Step 3: Target Clamp Preload (Fi @ 75% Proof)
Fi = 0.75 × Fp
Fi = 0.75 × 29301 N = 21976 N (21.976 kN)
Step 4: Tightening Torque (Dry K=0.20)
T = (K × d × Fi) / 1000
T = (0.20 × 9.525 mm × 21976 N) / 1000 = 41.864 N·m (30.877 ft-lbs)
Formula verified per ISO 898-1 and Machinery's Handbook 31st Edition. Assumes unhardened flat washer under head.
3/8"-16 UNC Torque Across All Grades & Friction Conditions
Comparison matrix calculated at 75% proof stress preload across Dry, Zinc, Oil, and Anti-Seize.
| Grade / Class | Dry (K=0.20) | Zinc (K=0.18) | Oil (K=0.15) | Moly (K=0.12) | Clamp (kN) | Proof (kN) |
|---|---|---|---|---|---|---|
| Grade 5 CURRENT | 41.864 Nm 30.877 ft-lb | 37.677 Nm 27.789 ft-lb | 31.398 Nm 23.158 ft-lb | 25.118 Nm 18.526 ft-lb | 21.976 | 29.301 |
| Grade 8 | 59.099 Nm 43.589 ft-lb | 53.189 Nm 39.23 ft-lb | 44.324 Nm 32.692 ft-lb | 35.459 Nm 26.154 ft-lb | 31.023 | 41.364 |
| 18-8 Stainless | 22.164 Nm 16.347 ft-lb | 19.948 Nm 14.713 ft-lb | 16.623 Nm 12.26 ft-lb | 13.298 Nm 9.808 ft-lb | 11.635 | 15.513 |
Frequently Asked Engineering Questions (3/8"-16 UNC Grade 5)
What is the recommended tightening torque for a 3/8"-16 UNC Grade 5 bolt?
For a 3/8"-16 UNC SAE J429 Grade 5 bolt torqued to 75% of proof load, the standard dry (unplated, K=0.20) tightening torque is 41.864 N·m (30.877 ft-lbs / 370.52 in-lbs). If lubricated with light machine oil (K=0.15), torque must be reduced to 31.398 N·m (23.158 ft-lbs). Under anti-seize paste (K=0.12), the recommended torque is 25.118 N·m (18.526 ft-lbs). Failure to reduce torque when lubricating causes bolt over-stretching or thread stripping.
What tap drill size should be used for tapping 3/8"-16 UNC internal threads?
The standard cut tap drill size for 3/8"-16 UNC is 5/16" (0.3125 in) (0.3125" / 7.938 mm), which delivers approximately 92.4% theoretical thread engagement. For extremely tough parent alloys (e.g. titanium, 17-4 PH stainless, Inconel), a 50% engagement drill of 8.666 mm is recommended to prevent tap binding and breakage without compromising joint pull-out strength.
What clamp preload and proof load does a 3/8"-16 UNC Grade 5 fastener develop?
With a tensile stress area (As) of 49.993 mm² (0.07749 in²) and a nominal proof stress of 586.1 MPa (85,000 psi), a 3/8"-16 UNC Grade 5 fastener possesses an ultimate proof load of 29.301 kN (6,587.1 lbf). At the standard 75% proof preload threshold, the fastener exerts a clamping force of 21.976 kN (4,940.3 lbf) across the joint interface.
What clearance hole diameters should be drilled for 3/8"-16 UNC bolts?
Per ASME B18.2.8 (Clearance Holes for Bolts, Screws, and Studs), recommended clearance hole diameters for a 3/8"-16 UNC fastener are: Close Fit = 9.804 mm (0.386"), Normal Fit = 10.084 mm (0.397"), and Loose Fit = 10.719 mm (0.422"). Normal fit is standard for general machinery assemblies, while Close fit is reserved for high-precision dowel-aligned flanges.
Recent Calculations
No recent calculations saved yet.